Data-driven energy decisiveness and optimisation for Kenya and East Africa

Generator diesel swings. Outages are growing. The answer starts with data.

Every power outage hour costs someone: output in a factory, diesel for the generators in a hotel, lifts and water pumps in an apartment block, confidence in a lender's credit file. Without one dated record per site, solar, storage and new connections are decided on estimates, or not at all.

Within 4 weeks, a board can decide from an approved, source-linked record: what power costs today, what is worth building and its 20-year value, or why not. Greenyield is an AI-native energy value architect, specialised in storage and dispatch, with energy, data, finance and legal expertise behind every result.

Why the numbers matter
  • 13.16 hwithout power a month for the average grid customer in FY2025/26; 9.42 a year earlier.EPRA statistics FY2025/26 and FY2024/25
  • KES 227.76a litre of diesel in Nairobi, the fuel for backup generators, up 9.90 in one month; the record was 242.92 in May 2026EPRA pump price reviews, via Tech-ish (14 Oct 2026), The Standard and The Star (May 2026)
  • 0 litresrefined in Kenya since 2013: every litre of petroleum fuel is importedEnerdata, 2 Oct 2026

Four questions every record answers:

  1. What does one hour without power cost, per unit produced?
  2. Which supply pays best: Kenya Power, own power or open access?
  3. What is the site worth over 20 years, and to whom?
  4. Can the board sign it off without a second opinion?
Where a record is heading
Where a site record is heading: 24 hours a day for 20 years. With monitoring, measured hours replace modelled ones.
Where a site record is heading: 24 hours a day, for 20 years. Measured hoursModelled hours With monitoring, measured hours replace modelled ones and each change re-dates the record.
Where to start
  • 500+ MWof grid connection projects analysed and structured by our founder
  • Every figure sourceddated and traceable to its source
  • USD 5,000per site, without a site visit
  • Expert-approvedevery record signed off before release

What outages cost a business

Every power outage hour ends up in the cost of each product. That cost can be measured, and taken out.

Every hour without power either stops production or burns imported diesel in a backup generator. At the national outage rate above, this is what every GWh used a year carries. Spread over what a site makes, it is a hidden energy cost on every product sold.

What each GWh carries
Output at risk
USD 30ka year per GWh used

During an outage, when nothing carries the load. Restarts and spoilage come on top; the scan shows which loads to protect first.

Generator diesel to ride through
USD 7.9k to 9.2kgenerator diesel a year per GWh used

Fuel for a generator to carry the same hours instead. Spread over the site's annual output, it is a cost on every unit.

CO2 from generator diesel
12 to 14 tCO2 a year per GWh used

From generator diesel. With a grid-charged battery carrying the load, about 90% less; charged from solar on site, zero in operation.

Scale 1 GWh a year is a site of about 115 kW average load. A factory using 10 GWh a year carries USD 305k of output at risk and USD 79k to 92k of generator diesel, every year, before restarts and spoilage.

  • Claritywhat power really costs a site, per product, on one dated record.
  • Continuitywhich loads to keep running through an outage, and with what.
  • Lower costless generator diesel and energy spend through storage, solar and dispatch, with savings verified against a baseline.

A site over 20 years: continue as today, or own power

Payback is the second question. The first is continuity: which processes and equipment must never lose power, and what carries them through every outage. The band shows the cost side for a site using 1 GWh a year at the national outage rate, without amounts: own solar and storage at two published cost levels; where it crosses the line is the payback, and the gap after it is the 20-year value.

Payback3.5 to 7.5 years
20-year value, solution and sizeSettled by the scan
Cumulative cost over 20 years for a site using 1 GWh a year: continuing with grid power and outages as today, against own solar and storage with the investment in year 0
Continue as today: grid, outages, generator dieselOwn solar and storage, investment cost bandPayback

Illustrative, on published cost levels and national averages, in today's prices. Which solution fits, how large, and where in this band a site lands, or whether it lands in it at all, is what the Energy Value Scan settles: measure first, then decide.

Turn this cost into a business model

The record settles what keeps critical processes and equipment running, what is worth building, how it pays and which way to pay fits: buy it, finance it, or pay per kWh. Greenyield then vets the technology partners able to deliver it and specifies what they build, on the site's measured data. Selection, specification and delivery are one process; the owner keeps the final choice.

Request an Energy Value Scan
Sources: every public input and its date
  • Generator dieselUSD 7.9k to 9.2k
  • Lost outputUSD 30k
The darker part of the generator diesel bar is its range. Generator diesel and lost output are alternatives for the same outage hours, never added up.
InputValueSource
Hours without power, average Kenya Power customer13.16 h a monthEPRA, Energy and Petroleum Statistics, FY2025/26, published September 2026
Output value per kWhUSD 1.69Greenyield valuation on KNBS Facts and Figures 2026, 2025 data, provisional
Generator fuel use0.25 to 0.29 l/kWhCaterpillar C32 and Cummins KTA50 data sheets
Diesel for generators, Nairobi pump priceKES 227.76 per litreEPRA pump prices, 15 Oct to 14 Nov 2026
Exchange rateKES 129.95 per USDCentral Bank of Kenya, daily rate, 30 Oct 2026
CO2 per litre of diesel2.697 kgUS EPA Emission Factors Hub, January 2025 (10.21 kg per US gallon)
Grid power, all-in, large C&I siteKES 24.90 per kWhEPRA, tariff CI1, December 2025; see the index
The site's own figuresNot yet measuredMeasured in the Energy Value Scan

National averages hide the spread between sites. That gap is exactly what a site record closes. The derivation behind each Greenyield valuation is shared with clients and their lenders. Figures as of 31 October 2026.

From generator diesel to own power

Generator diesel is a cost no site can control. Own power turns it into a business model.

Every generator hour is paid at a price set abroad. Solar and storage on site turn that running cost into an asset with no fuel to buy. The record shows which model pays for the site.

How own power pays, in one day and three models
511.5 bn

KES spent on imported petroleum products in 2025.

KNBS Facts and Figures 2026, Table 25, provisional

Clean generation, flexible storage, intelligent dispatch

Illustrative day on a site: solar by day, grid power stored off-peak at night, a morning outage carried by the battery, solar surplus stored at midday and delivered at the evening peak
  • Solar on site
  • Site demand
  • Stored: grid power off-peak, solar surplus at midday
  • Delivered from storage
  • Grid outage
An illustrative day, not site data. The battery charges off-peak at night, carries the site through a morning outage, refills from solar at midday and covers the evening peak. The generator stays off.

Grid, generator, often solar. Storage is the missing piece, and where 20-year value is made.

We move the value of daytime solar into the evening and night, so a site stops buying expensive power and stops losing output in an outage. The same battery can earn very different returns, depending on how it is sized and run. Designing that over 20 years is our specialism. We do not sell batteries; we turn them into bankable projects that keep power secure for 20 years.

  1. GridKenya Power
  2. Generatordiesel backup
  3. Solaroften on the roof
  4. Storage and dispatchthe missing piece

Solar produces by day. When does the line run?

The scan sets the mix: storage alone, storage with solar, or light solar, sized on the site's own load. The bottom line is one number: the cost per product, before and after.

Buy itCapex

The site owns the system; every saving stays with the owner.

Scan gives: size and payback on measured load

Finance itLoan or lease

A lender or lessor spreads the cost over the years.

Lender Readiness Pack, then Pre-BFS: cash flows a lender can underwrite

Pay per kWhEnergy as a service

An investor owns and runs the system; nothing upfront.

Pre-BFS gives: a kWh price an investor can commit to

Built by vetted technology partners, to the specification the record sets. The owner keeps the final choice.

Beyond the siteEnergy sovereignty, and firm power for Kenya's AI build-out.

Energy sovereignty, site by site

Each site that replaces generator diesel with its own solar and storage cuts the country's fuel import bill and its exposure to the dollar. It also keeps its output running through an outage.

Calculated from the figures above

Power for Kenya's AI build-out

Kenya's National AI Strategy 2025 to 2030 names AI digital infrastructure as its first pillar. Data centres and AI workloads need firm power around the clock; we work out whether that power case can be made bankable.

Ministry of Information, Communications and the Digital Economy, launched 27 Mar 2025

Kenya power cost index

What power costs a Kenyan site, updated every month.

Large users take nearly half of Kenya's grid electricity. Faster, simpler investment in their solar and storage helps keep the grid stable. Every record starts from these public figures, refreshed after each monthly EPRA price review.

Generator diesel in Nairobi: index 133EPRA maximum pump price, KES a litre, November 2025 = 100

Up 32.8% since November 2025, from KES 171.47 to 227.76; the record of 242.92 held from 15 to 18 May 2026. EPRA monthly price reviews, November 2025 to October 2026, as published by EPRA and reported by Citizen Digital, The Star and HapaKenya.

Four figures behind the index
24.90

KES per kWh from the grid for a commercial or industrial site on tariff CI1 (415 V, over 15,000 kWh a month), taxes and pass-through charges included.

EPRA Biannual Statistics Report 2025/26, Table 2.4, December 2025
57 to 66

KES per kWh for generator diesel alone, before maintenance.

KES 227.76 a litre x 0.25 to 0.29 litres per kWh, generator datasheets
4.10

KES per kWh in fuel cost, forex and water levy charges on October 2026 bills, on top of the base tariff.

EPRA, via Capital FM, 11 Oct 2026
under 3.3%

Reserve margin reported in August 2026, against the 20 to 35% the IEA recommends. Peak demand reached 2,514 MW on 29 June 2026, up 8.55% in a year.

Business Daily, 26 Aug 2026; EPRA statistics FY2025/26, via Commonwealth Union, 5 Oct 2026

Weather A strong El Niño is forecast through early 2027, with above-average short rains over about 80% of Kenya. Kenya Power names falling trees, wind and washed-out poles as the main causes of outages in heavy rain. Wet years strain the lines; dry years cut hydropower and raise the fuel charge.NOAA Climate Prediction Center, 8 Oct 2026; Kenya Meteorological Service, via Capital FM, 26 Aug 2026; Kenya Power, via Kenyans.co.ke, 18 Oct 2023; KenGen, year to June 2023, via Nation

October 2026 edition. Updated after each EPRA pump price review on the 14th; the next edition follows the review of 14 November 2026.

More grid figures
3.91

Interruptions per month in FY2025/26, each a possible restart; 3.67 a year earlier. EPRA target and regional benchmark: 1.10.

EPRA statistics FY2025/26 and FY2024/25
74.6%

Share of Kenyan firms that reported experiencing electrical outages.

World Bank Enterprise Surveys, Kenya 2025
47.6%

Share of Kenya's electricity consumption that goes to large commercial and industrial customers: 5,920 GWh.

EPRA statistics FY2025/26
The rules that move these numbersOpen access, energy management, off-peak thresholds and Mission 300.

Open access is law

Large users may buy power directly from a producer and pay to have it carried over the grid, on terms approved by EPRA. This applies from 1 MVA on the local network and 10 MVA on the high-voltage grid. Which route pays for a site is a question of data.

Legal Notice 79 of 2026, gazetted 8 May 2026

Energy management is regulated

Facilities using more than 180,000 kWh of energy a year need an energy audit at least once every four years, by a licensed auditor. They must realise at least half of the recommended savings within three years of submitting their investment plan. Our records feed that plan; they do not replace the licensed audit.

Energy (Energy Management) Regulations 2025, Legal Notice 18 of 2025, regs. 5, 8 and 10(2)(a)

Off-peak rates follow each site's own record

Commercial and industrial customers get 50% off the energy charge in off-peak hours, but only on units above a monthly threshold. For an existing site, that threshold is set from its own average over the previous six months. EPRA's amendment of 18 September 2026 extended the same rule to e-mobility customers. Each site's off-peak saving depends on its own consumption record.

EPRA Biannual Statistics Report 2025/26; Gazette Notice 15188 of 18 Sep 2026, as reported by Citizen Digital (22 Sep 2026) and Tech-ish (25 Sep 2026)

Mission 300 sets the pace

Kenya endorsed its National Energy Compact under Mission 300 on 24 September 2025, with a target of universal access to electricity and clean cooking by 2030. The draft plans a centralised energy data repository for FY2026/27; our site records are structured so they can feed it.

World Bank, 24 Sep 2025; Kenya National Energy Compact, Draft 2, Jul 2025, Pillar V

Results as a Service

Priced per finished result. Each one ends in a decision.

Few boards, developers, lenders or ministries can see what a site's energy mix really costs, or the hidden costs and gains in its grid connection; often the site itself cannot either. Each result below makes that visible and ends at a clear, agreed completion point. No licences, no seats, no hourly billing.

  1. Energy Value Scan4 weeksGo, or a reasoned no
  2. Lender Readiness Pack+ 4 weeksReady for a lender
  3. Pre-BFS+ 2 monthsReady for the final study
  4. Bankability Feasibility Studyproject ownerFinancing signed
  5. Monitoring and dispatchyears 1 to 20Value verified every month

The scan is an investment, not a cost. For a site on 10 GWh a year, hidden energy costs run at USD 79k to 305k every year: 16 to 61 times the price of the scan. The insight starts there; the next results build on it. The question for a board: what does one more year of deciding on estimates cost?

What each result contains
ResultComplete whenInvestment
Decideeach result ends in a decision
1

Energy Value ScanAvailable now

  • Today's cost of power, per unit the site produces
  • Power reliability, the cost of outages and which loads come first
  • The supply that pays best: grid, own solar and storage, or open access
  • The investments worth making, with their payback and 20-year value, or a reasoned no
  • The next step, and what is still missing to take it
Complete whenThe dated record is approved and delivered.
USD 5,000per site, without site visitSmaller sites: Energy Value Scan Light, on request
2

Lender Readiness PackAvailable now

  • The financing case for one project
  • The documents a bank's technical adviser checks, in the order they check them
  • Open points, each with what closes it
Complete whenThe pack is ready to open a financing conversation.
on requestsite visit included, within 4 weeks after a go
3

Pre-BFSAvailable now

  • A first feasibility study that answers most of what a bank asks before it lends
  • A 20-year earnings and impact model, built for a lender's review
  • A handover an engineering adviser can complete into the Bankability Feasibility Study
Complete whenThe traceable study is delivered.
on requestsite visit included, within 2 months
4

Bankability Feasibility StudyWith partners

The final study a bank requires, by an engineering adviser the project owner hires and pays.

For referenceNot a Greenyield product; the Pre-BFS is its starting point.
by the project ownernot Greenyield
Optimiseevery month, from the first record
↻

Record kept currentAvailable now

  • Re-dated every month as generator diesel, tariffs, outages and rules change
  • Re-issued every quarter, approved by an expert
  • An alert when a change can alter the decision
  • With monitoring, worth more each month: measured data takes the place of estimates
Complete whenEach quarter's record is approved and re-issued.
on requestfirst quarter included with every scan
5

Monitoring and dispatchWith first projects

  • After financing: batteries, solar and generators scheduled on the site's own measured data
  • Hourly records of clean power, ready for Scope 2 reporting
  • ESG and SDG figures in the metrics lenders and DFIs track
Complete whenEach month's savings are measured against the baseline and independently verified.
on requestlinked to verified added value
Measure firstTo measure is to know. The owner decides what changes.

Every battery, solar array and generator is measured before anything changes. The record shows what better scheduling would have saved; the owner decides whether and when to act on it.

  1. Measurerecord
  2. Adviserecommend
  3. Simulateshow the saving
  4. Approveowner signs off
  5. Automatewhere the owner chooses
Each site moves one stage at a time, on its own measured record, and only when the owner decides.
  • Measure

    Own meters where data is missing

    Captured on site where no usable data exists yet.

  • Monitor

    A monthly view of what power really costs

    Outages, generator diesel and tariff exposure in one view, with alerts when something drifts.

  • Dispatch

    Scheduled on measured data

    Each asset runs on the site's measured profile, alongside the systems already on site.

  • Verify

    Independent by design

    Savings are verified by an independent party, never by the party that dispatches or shares in them.

The conventional route, compared

Conventional route

Committed before a first answer
The full feasibility study, commissioned upfront. Project preparation typically costs 5 to 10% of total investment in developing countries.
Time to first answer
When the draft study arrives, months in
What it delivers
A static report. Tariffs, fuel prices and outage data move on from the day it is issued.
Horizon
One go or no-go on one project

Greenyield route

Committed before a first answer
USD 5,000 per site to start
Time to first answer
Within 4 weeks to the first approved record
What it delivers
A dated decision record. Every figure citable and auditable, with its source and date. With the record kept current, each change shows what moved, why and what it does to the value.
Horizon
Hidden costs and gains over a 20-year asset life, found and put to work

80% of infrastructure projects in Africa fail at the feasibility and business-plan stage. The first answer should come before that spend, and the full study only for projects that pass. Sources: McKinsey, Solving Africa's infrastructure paradox, 6 Mar 2020 (80%); Global Infrastructure Hub, 19 Mar 2019 (5 to 10%).

Impact projects with leading partners

From microgrids to sovereign energy and AI compute infrastructure. Where a network of sites or an area needs new capacity, Greenyield can initiate the project with leading partners to build, finance and run it. Where we advise a single site, we stay independent of the build: independent in the advice, accountable for the record and, with monitoring, for what the dispatch delivers.

Note

Not an energy audit. The scan is not a statutory energy audit, and not financing, investment or legal advice. The scan is desk-based; site visits come with the later results and are priced in. Prices exclude taxes.

How we work

Expert-coded AI. Expert-approved results.

Every result is a decision a board and a lender can act on: each figure sourced and dated, each open point named, approved before it leaves us. It comes from a proprietary, codified doctrine and methodology, built on years of grid-connection, storage and trading practice and applied by AI to every site. That is what AI-native means here: production and checks are automated, so every site gets the same rigour within weeks. Judgement, approval and accountability stay with people: an expert signs off every release. No record goes out without that approval. The method stays in-house; what a client receives is the result, not the method.

One line, three stages. Then it stays current: each month the line runs again on new tariffs, fuel prices and outages, and each quarter an expert approves the new version.
  1. Measurethe site, in its own data
  2. Decideon an approved, source-linked record
  3. Realisethrough the partners we select, to completion
Track record and team

A track record that can be tested. Every forecast is dated and stored before the outcome is known, in a ledger running since 28 August 2026. Each one is shown against the outcome once it is published, misses included. Getting started asks little of the site team; we gather the rest.

Forecasts on record: Kenya's electricity demand, TWh a year

YearLogged 28 Aug 2026Logged 19 Sep 2026Outcome
202616.2 to 17.016.0 to 17.3Not yet published
202717.3 to 18.117.2 to 18.5Not yet published
202818.5 to 19.218.4 to 19.7Not yet published

6 forecasts since 28 August 2026, each with a range. None has resolved yet; the first resolve when the 2026 annual figures are published. Every run stays on record. Outcome source: Ember yearly electricity data, Kenya.

Local and international specialists in energy, finance and law

Dutch practice in smart storage, dispatch and monitoring, joined with local knowledge of Kenya's grid, tariffs and rules.

The Netherlands is one of the most data-rich power markets in the world. We bring that practice to Africa, site by site and country by country.

Led by Derck Mekkering, founder. His experience spans energy trading, the commercial build-up of an industrial battery company with its own energy management system, and grid connection development. That practice is what our doctrine codifies.

Around him work specialists in utility-scale renewable energy development, project finance and law. Each record is written the way a lender, an investor and their counsel will read it.

What the record holds

The value sits in 20 years of operation.

Grid costs, outage losses and generator diesel are where a record starts, not where it ends. Each scan carries a 20-year value preview of costs, yields and impact. Its detail grows with the evidence: a preview in the scan, a lender-grade model once the site's own data is in. The Pre-BFS turns it into a 20-year earnings model a lender can test, and measured data replaces assumptions as the years run. Where a contract runs shorter than the asset, the model still covers the full life, so a lender sees what it finances.

  • Hidden costs foundYear 0

    Energy Value Scan, then Lender Readiness Pack and Pre-BFS

  • Value put to workYears 1 to 20

    Storage, solar and smarter scheduling

  • Impact recordedYears 1 to 20

    Litres of generator diesel, tCO2 and outage hours, measured once monitoring runs

  • Record kept currentMonthly, approved quarterly

    Refreshed every month, approved every quarter, with an alert the moment the answer could change

What the record covers

Costs

  • Grid tariff and demand charges
  • Outage losses and restarts
  • Generator diesel

Yields

  • Savings from storage and solar
  • Open access supply
  • Trading and grid services as markets open

Finance

  • Returns and debt cover
  • Cost per MWh delivered
  • Sensitivities a lender will test

Impact

  • Litres of generator diesel avoided
  • tCO2 avoided, factor stated
  • SDG indicators measured on site
The energy data layerNational statistics explain the system. Site measurements explain the decision.

Forecasting, storage sizing, dispatch and credit review all depend on dated, granular data. In the Netherlands, the grid operator publishes a snapshot of the system balance every 12 seconds, and dispatch algorithms are built on that stream. Kenya's public statistics are monthly, so the finer data has to come from the site itself. An hour that passes unmeasured cannot be measured afterwards: the earlier a site starts its record, the more that record is worth.

How often public power system data is updated
  • Netherlands, grid operatorevery 12 seconds
  • Kenya, public statisticsmonthly, 2 months after

Log scale. Public data only; utilities may hold finer operational data. TenneT balance delta, every 12 seconds since 25 Nov 2025; KNBS release calendar FY2025/26, monthly totals about two months after the month.

216,000x

more often in the Netherlands: a 30-day month holds 216,000 twelve-second intervals.

30 x 24 x 3,600 / 12
Standards

Formats lenders already know

We use the vocabulary of Orange Button for solar asset data, the Investor Confidence Project for project baselines and IPMVP for savings verification. No conformity or certification is claimed.

Changes

Every change is logged

With its date and its reason. A lender sees what changed and why.

Benchmarks

Compare without exposure

Anonymised, aggregated figures let a site compare itself with its peers. Nothing is shown for a group too small to stay anonymous.

What this means for a client

Clients pay for a finished result, never for data collection or access to a database. The record is theirs to use; the layer behind it means every next site starts from more evidence and fewer assumptions.

Citable impactIn Kenya, the climate value is in generator diesel.

Kenya's grid emitted 0.053 tCO2 per MWh in FY2025/26; a diesel generator emits 0.67 to 0.78. Cover the same outage hours with a battery charged from the grid and the CO2 falls by about 90%. Charge it from solar on the site and operating emissions fall to zero. We report it per site, with the factor and its source on every line; with monitoring, per hour.

  • Diesel generator0.67 to 0.78 t
  • Battery, grid-charged0.063 t
  • Battery, solar-charged0 t in operation
  • Kenya grid0.053 t
Grid: 833,833 tCO2 over 15,601,022 MWh, EPRA Energy and Petroleum Statistics, FY2025/26, section 2.3.
Diesel generator: 0.25 to 0.29 l/kWh × 2.697 kg CO2 per litre (US EPA, 2025) = 0.67 to 0.78 tCO2/MWh.
Battery: grid factor ÷ 85% round-trip efficiency (NREL (now NLR) Annual Technology Baseline 2025) = 0.063 tCO2/MWh.
Operating emissions only; manufacturing is excluded for every option, so the comparison stays like for like.
SDG targetWhat we measure on the site
7.1Reliable accessOutage hours avoided for critical load
7.2Renewable shareMWh of solar and storage replacing generator diesel
7.3EfficiencyMWh saved per unit of output
8.2ProductivityDowntime hours and lost output avoided
9.4Cleaner industrytCO2 per unit of output
13.2Climate actiontCO2 avoided, with the factor and source stated

We only claim targets we can measure on the site, and we set a baseline before anything changes.

Hourly matching, prepared for when buyers ask

With monitoring, we collect hourly meter data on generation, storage and use, so a company can show how clean its power was for Scope 2 reporting. The GHG Protocol has proposed hourly matching, with exemptions, in its revision of Scope 2; the outcome is still open. Its public consultation ran from October 2025 to January 2026. A consolidated consultation is planned for Q2 2027, and the revised standard for Q4 2028.

Certificates, kept independent

We do not issue certificates. In Kenya, I-REC(E) certificates are issued by EPRA as the accredited issuer, and certificates never pass through the party that dispatches.

ESG that lenders can use

Records follow the questions lenders ask under the IFC Performance Standards and the Equator Principles, and report in the metrics DFIs track:

  • Litres of generator diesel and tCO2 avoided
  • MWh saved and outage hours avoided
  • MW and MWh of solar and storage enabled
  • Capital mobilised

Who we work with

One record, read eight ways.

One methodology for the whole chain, from developer to lender to regulator. Each reads the same dated, sourced record, so no one rebuilds the evidence. Kenya first, then country by country.

What the record gives each reader
ReaderWhat the record gives each readerTypical first result
Factories and commercial sitesThe real cost of outages, generator diesel and tariffs per unit produced, and which investment brings it down most, with its 20-year value. From single plants to networks: factories, health facilities, schools, water utilities, cold chains and telecom sites. Sites covered by the energy management rules and multi-site networks first.Energy Value Scan
Renewable energy developers and technical advisersA decision per solar, solar-with-battery or hydro project, then pre-feasibility that answers lender questions in the order they are asked.Energy Value Scans across a project pipeline
Industrial parks and economic zonesLoad and reliability per tenant, the case for shared solar and storage behind the park's own substation, and dated uptime figures that help attract tenants.Energy Value Scans across tenants
Technology and EPC partnersSites specified on measured data, so systems are sized and quoted against real profiles. With monitoring, a measured record of what each system delivers.Energy Value Scan for a client site
Data centres and AI infrastructureWhat firm power on or near the site takes, what it costs over 20 years and how it can be financed.Energy Value Scan
Lenders, DFIs and banksRecords that follow a technical adviser's checklist, measured series that replace assumptions, and impact metrics in the form DFIs report.Energy Value Scans across a pipeline; Lender Readiness Pack via the project owner
Investors20-year earnings and impact models per site, with a forecast record that can be checked.Energy Value Scans across a portfolio
Governments and regulatorsFor the public sites they run, the full record. For policy, anonymised and aggregated evidence across sites on reliability, generator diesel use and emissions, so open access, energy management and Mission 300 rest on measured facts. We also advise on energy policy, sovereign energy strategy and AI compute.Energy Value Scans for public sites; government advisory

Any reader can commission any result. Every record states who commissioned it.

Questions

What boards, lenders and governments ask first

Is the Energy Value Scan an energy audit?

No. It is a commercial decision record. Statutory energy audits in Kenya are carried out by licensed energy auditors, audit firms or energy service companies. The record gives the auditor and the investment plan a dated, sourced starting point.

What exactly do I pay for?

An approved, dated record with every figure sourced, a decision path and a list of what is still missing. The price is fixed before we start.

What if the answer is no?

Then the answer comes within 4 weeks, before anything larger is spent. The record shows why, with the figures behind it, and what would have to change for the project to pay. A reasoned no protects capital, at the same price as a yes.

What do you need from us?

Only what the site already holds. One structured request at the start, no new measurements, and no site visit for the scan. Everything public we source ourselves. A Lender Readiness Pack or Pre-BFS adds a site visit, priced into its quote.

Does it work for a site that already has solar or a battery?

Yes. The scan looks at the whole site as it runs today, including existing solar, storage and generators, and shows what they deliver against what they could.

Will the numbers hold up with a bank?

Every line carries its source and its date. A lender's adviser can trace every input to its source and check the arithmetic behind every derived figure. The doctrine and methodology that decide what to calculate stay with us, applied the same way on every site.

Why 20 years?

Solar, storage and grid assets are financed over long lives, and a one-year view can hide what happens in year ten. With monitoring, measured data replaces modelled inputs year by year.

Who is accountable if AI builds the record?

People. AI does the production by fixed steps and checks each figure against its source. A Greenyield expert approves every record before release.

Do you sell batteries or solar panels?

No. We vet which technology partners are fit to deliver and write the specification they quote and build against. The owner compares like with like and keeps the final choice. Any supplier arrangement is part of the client's contract.

Who owns the site data?

The site's data stays the client's. The client receives the record to use and to share with its board, lenders and advisers. All other rights, including in the method and in anonymised learning, are set out in the agreement. Personal data is handled as described in our privacy notice.

What does this give a ministry or regulator?

Site-level evidence instead of national averages: what outages cost per site, how much generator diesel can be replaced by solar and storage, and which route pays under open access. Every figure carries its source and date, so it can be checked before policy rests on it. Greenyield also advises ministries and regulators directly, from open access and energy management rules to sovereign energy and firm power for AI compute. What is shared with public bodies is anonymised and aggregated.

Start with one site

One site is enough to start. Within 4 weeks, its record shows what it is worth.

Where it is, roughly what it uses and whether it runs a diesel generator as backup is enough for a first conversation. Scans start in order of request.

Request an Energy Value Scan

We use your details to answer your request and, if you engage us, to deliver our services. See the privacy notice.

Privacy noticeHow we handle your details

Who we are. Greenyield Energy is the trading name of Add a Member B.V., Utrechtsedwarsstraat 117A, 1017 WE Amsterdam, the Netherlands (Chamber of Commerce 86692623, VAT NL864051888B01), working with Greenyield Kenya (in incorporation), Nairobi, Kenya. Add a Member B.V. is responsible for the personal data you send us. Write to [email protected] about your data at any time.

What we collect and why. When you email us: your name, contact details, company and the site information you share. We use it to answer your request and to prepare and deliver our services, because you asked us to and because we have a legitimate interest in responding. This site has no contact form.

Voluntary. Sharing your details is voluntary. Without them we cannot reply to you.

Who receives it. Only the service providers that host our website and email, acting on our instructions. Where they process data outside the EU or Kenya, we rely on the safeguards those laws require. We do not sell your data or use it for unrelated marketing.

How long and how safe. We keep it only as long as needed for your request and our business relationship, or as the law requires, with access limited to the people who need it.

Your rights. You can ask to see, correct or delete your data, or object to its use, by writing to [email protected]. You can also complain to the Dutch Data Protection Authority (Autoriteit Persoonsgegevens) or Kenya's Office of the Data Protection Commissioner.

Cookies and this website. We place no advertising or tracking cookies and use no contact form or chat widget. To show this page, your browser loads fonts from Google Fonts and the page from our website host, Durable, via Cloudflare; these providers receive your IP address. Durable also keeps a small record in your browser's local storage with your IP address and the date of your visit, and visits are counted with Cloudflare Web Analytics, which uses no cookies.

Kenya. For people in Kenya we apply the Data Protection Act, 2019. Where registration with the Office of the Data Protection Commissioner is required, we register.

© 2026 Greenyield · Energy value architecture for East AfricaPrivacy notice
Add a Member B.V., trading as Greenyield Energy, Utrechtsedwarsstraat 117A, 1017 WE Amsterdam, the Netherlands. Chamber of Commerce (KvK) 86692623. VAT NL864051888B01. Greenyield Kenya (in incorporation), Nairobi, Kenya.